Things got busy again with a short trip and a holiday weekend, so updates got delayed. But as a result, that just means more cool stuff to present!

Updates

Demod LM

The PCBs, plates, and aluminum case prototypes came in, and I knocked out the firmware for it fairly quickly. The PCB works perfectly and needs no modifications. I did screw up the stabilizer cutouts on the plate and had to send off a new order for sample plates. The aluminum case works great, but two of the feet were placed in the wrong location, so the design has been fixed now.

Demod LM - idk why I put the 1 key sideways

The next step is to get silicone tray liner samples made.

Demod LM next to Quefrency LM

Additionally, we had a custom set of LPF keycaps made for the Demod LM that matches up with LPF Legend Glow.

Quefrency LM

The PCBs, plates, and aluminum case prototypes also came in at the same time as the Demod LM. The firmware has also been completed, and no changes to the PCBs need to be made.

Quefrency LM halves joined up together
Bottom view of Quefrency LM halves joined up together

Like with the Demod LM, silicone tray liner samples need to be made as well.

We are also planning to have an LPF keyset made with support in mind for the Quefrency LM and the upcoming Sinc LM.

FoldKB Rev. 2

The prototype PCBs came in, the firmware has been written, and everything is working as expected. The order for the PCBs has been placed shortly, so they should be available in about two weeks.

Revised plates for the FoldKB should also be arriving soon, and the bottom plates of these plates now use Shroomies.

Nyquist LM

Aluminum cases and PCBs arrived, and the firmware is complete.

4-row and 5-row versions
4-row version that I'm currently using for myself

There was a slight error in the placement of two of the feet, and the design model has been fixed now.

Other Updates

A lot of things are currently being reordered now, and some more PCBs are getting ESD protection enhancements, like the Iris LM-G.

After ordering of all the new LM products is complete, work on Sinc LM will begin.